Măieruș Bridge

Project: The rehabilitation of the railway line Brașov – Simeria, part of the Rhine – Danube Corridor, section Brașov – Sighișoara
Structure: Bridge at km 200+943
Superstructure type: Double track simply supported Truss Girder, 45,00m span, with concrete deck supporting the ballast prism
Infrastructure type: massive RC abutments and piers
Foundation type: deep foundation formed of RC drilled piles and pile caps
Services by MLBE: Structural Analysis and Technical Consultancy
